<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Upgrade on</title><link>https://docs.protegrity.com/aiteam-edition/docs/infrastructure/ppc/aws/upgrading_ppc/</link><description>Recent content in Upgrade on</description><generator>Hugo</generator><language>en</language><atom:link href="https://docs.protegrity.com/aiteam-edition/docs/infrastructure/ppc/aws/upgrading_ppc/index.xml" rel="self" type="application/rss+xml"/><item><title>Automated script-based upgrade</title><link>https://docs.protegrity.com/aiteam-edition/docs/infrastructure/ppc/aws/upgrading_ppc/auto_upgrade/</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://docs.protegrity.com/aiteam-edition/docs/infrastructure/ppc/aws/upgrading_ppc/auto_upgrade/</guid><description>&lt;h2 id="before-you-begin">Before you begin&lt;/h2>
&lt;p>Before starting an upgrade, ensure the following conditions are met:&lt;/p>
&lt;ul>
&lt;li>
&lt;p>Access to the jump box associated with the PPC v1.1.0 cluster is required. This must be the same jump box used during the PPC v1.1.0 installation.&lt;/p>
&lt;/li>
&lt;li>
&lt;p>Create a Velero backup and an OpenSearch snapshot to ensure data recovery is possible.&lt;/p>
&lt;/li>
&lt;li>
&lt;p>Ensure that the &lt;code>context&lt;/code> is set to the cluster where the upgrade operation is to be performed. Run the following command:&lt;/p></description></item><item><title>Manual component-based upgrade</title><link>https://docs.protegrity.com/aiteam-edition/docs/infrastructure/ppc/aws/upgrading_ppc/modular_upgrade/</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://docs.protegrity.com/aiteam-edition/docs/infrastructure/ppc/aws/upgrading_ppc/modular_upgrade/</guid><description>&lt;h2 id="before-you-begin">Before you begin&lt;/h2>
&lt;p>Before starting an upgrade, ensure the following conditions are met:&lt;/p>
&lt;ul>
&lt;li>
&lt;p>Access to the jump box associated with the PPC v1.1.0 cluster is required. This must be the same jump box used during the PPC v1.1.0 installation.&lt;/p>
&lt;/li>
&lt;li>
&lt;p>Create a Velero backup and an OpenSearch snapshot to ensure data recovery is possible.&lt;/p>
&lt;/li>
&lt;li>
&lt;p>Ensure that the &lt;code>context&lt;/code> is set to the cluster where the upgrade operation is to be performed. Run the following command:&lt;/p></description></item></channel></rss>